Engine Mechanical: Starter: Starting: Starter: Installation
- INSTALL STARTER ASSEMBLY
- Install the starter assembly with the 2 bolts.
Torque: 39 N*m (400 kgf*cm, 29 ft.*lbf)
- Connect the engine wire protector with the bolt.
- Connect the starter cable with the nut.
Torque: 9.8 N*m (100 kgf*cm, 86 in.*lbf)
- Connect the starter connector.
- Install the starter assembly with the 2 bolts.
- INSTALL AIR PUMP ASSEMBLY WITH BRACKET (See INSPECTION )
- INSTALL REAR WATER BY-PASS JOINT RH
- Install 2 new gaskets to the cylinder head.
- Install the 4 nuts holding the water by-pass joint to the cylinder heads. Alternately tighten the nuts.
Torque: 18 N*m (185 kgf*cm, 13 ft.*lbf)
- INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
- Install a new O-ring to the water by-pass pipe.
- Apply soapy water to the O-ring.
- Push the water by-pass pipe end into the pipe hole of the water pump.
- Install the water by-pass pipe with the bolt.
Torque: 18 N*m (185 kgf*cm, 13 ft.*lbf)
- Install the wire clamp to the bracket of the water by-pass pipe.
- INSTALL INTAKE MANIFOLD ASSEMBLY
- Install 2 new gaskets to the cylinder head.
- Install the intake manifold assembly with the 6 bolts and 2 nuts.
Torque: Bolt
18 N*m (185 kgf*cm, 13 ft.*lbf)
Nut
18 N*m (185 kgf*cm, 13 ft.*lbf)
- CONNECT WATER BY-PASS HOSE
- Connect the water by-pass hose.
- CONNECT NO. 7 WATER BY-PASS HOSE
- Connect the No. 7 water by-pass hose.
- INSTALL ENGINE WIRE
- Install the engine wire with the 3 bolts.
Torque: 8.2 N*m (83 kgf*cm, 72 in.*lbf)
- Connect the water temperature sensor connector.
- Connect the throttle position sensor connector.
- Connect the 8 fuel injector connectors.
- Install the engine wire with the 3 bolts.
- CONNECT FUEL VAPOR FEED HOSE ASSEMBLY
- Connect the fuel vapor feed hose assembly.
- CONNECT NO. 2 FUEL HOSE
- Connect the No. 2 fuel hose.
- CONNECT FUEL HOSE (See INSTALLATION )
- INSTALL AIR CLEANER HOSE ASSEMBLY
- Install the air cleaner hose assembly.
- ADD ENGINE COOLANT (See COOLANT )
- CHECK FOR ENGINE COOLANT LEAK (See COOLING SYSTEM )
- CHECK FOR FUEL LEAK (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER SUB-ASSEMBLY
Torque: 7.5 N*m (80 kgf*cm, 66 in.*lbf)
- CONNECT BATTERY NEGATIVE TERMINAL
- Connect the battery negative terminal.