Transfer Control Solenoid: Installation
WARNING: This page is about a different car, the 2007 Lexus IS 250. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL TRANSFER CONTROL SOLENOID
- Install the transfer control solenoid and solenoid lock plate to the transfer upper valve body with the bolt.
Torque: 6.4 N*m (65 kgf*cm, 57 in.*lbf)
HINT:
Install the solenoid lock plate into the cutout on the transfer control solenoid.
- Install the transfer control solenoid and solenoid lock plate to the transfer upper valve body with the bolt.
- INSTALL TRANSFER VALVE BODY ASSEMBLY (See INSTALLATION )
- INSTALL TRANSFER OIL PAN (See INSTALLATION )
- INSTALL TRANSFER DYNAMIC DAMPER (See INSTALLATION )
- INSTALL ENGINE REAR MOUNTING MEMBER (See INSTALLATION )
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (See INSTALLATION (For 2GR-FSE) INSTALLATION (For 4GR-FSE) )
- INSTALL HEATED OXYGEN SENSOR (See INSTALLATION (For 2GR-FSE) INSTALLATION (For 4GR-FSE) )
- INSTALL FRONT CENTER FLOOR BRACE (See INSTALLATION (For 2GR-FSE) INSTALLATION (For 4GR-FSE) )
- INSTALL REAR NO. 1 FLOOR PANEL BRACE (See INSTALLATION (For 2GR-FSE) INSTALLATION (For 4GR-FSE) )
- ADD AUTOMATIC TRANSMISSION FLUID (See INSTALLATION )
- CHECK FOR EXHAUST GAS LEAKS