Transfer Valve Body Assembly: Installation
WARNING: This page is about a different car, the 2007 Lexus IS 250. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL TRANSFER CONTROL SOLENOID (See REASSEMBLY )
- INSTALL TRANSFER VALVE BODY ASSEMBLY
- Connect the transfer wire connector to the transfer control solenoid.
- Install the transfer upper valve body with the 4 bolts.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- INSTALL TRANSFER OIL PAN (See INSTALLATION )
- INSTALL TRANSFER DYNAMIC DAMPER (See INSTALLATION )
- INSTALL ENGINE REAR MOUNTING MEMBER (See INSTALLATION )
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (See INSTALLATION (For 2GR-FSE) INSTALLATION (For 4GR-FSE) )
- INSTALL HEATED OXYGEN SENSOR (See INSTALLATION (For 2GR-FSE) INSTALLATION (For 4GR-FSE) )
- INSTALL FRONT CENTER FLOOR BRACE (See INSTALLATION (For 2GR-FSE) INSTALLATION (For 4GR-FSE) )
- INSTALL REAR NO. 1 FLOOR PANEL BRACE (See INSTALLATION (For 2GR-FSE) INSTALLATION (For 4GR-FSE) )
- ADD AUTOMATIC TRANSMISSION FLUID (See INSTALLATION )
- CHECK FOR EXHAUST GAS LEAKS