LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2007 >> LS 460 >> Repair and Diagnosis >> External Pages >> Different car >> Section 764 (Engine Control System - Component Testing) >> VIAS >> Component Inspection >> VIAS Control Solenoid Valve >> With CONSULT-II
April 5, 2026: LEMON Manuals is launched! Read the announcement.

With CONSULT-II

WARNING: This page is about a different car, the 2007 Nissan Quest. However, it is still accessible from the selected car via links, so may be relevant.
  1. Reconnect harness connectors disconnected.
  2. Turn ignition switch ON.
  3. Perform "VIAS SOL VALVE" in "ACTIVE TEST" mode.
  4. Check air passage continuity and operation delay time under the following conditions.
    CONNECTOR TERMINAL CONTINUITY SPECIFICATION

    Condition VIAS SOL VALVE Air passage continuity between A and B Air passage continuity between A and C
    ON Yes No
    OFF No Yes

    Operation takes less than 1 second. 

    Fig 1: Identifying VIAS Control Solenoid Valve
    G04897282Courtesy of NISSAN NORTH AMERICA, INC.