Park / Neutral Position Switch: Installation
- INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Install the switch to the manual valve shaft.
- Temporarily install the bolt.
- Install a new lock washer with the nut.
Torque: 6.9 N*m (70 kgf*cm, 61 in.*lbf)
- Temporarily install the control shaft lever.
- Turn the control shaft lever counterclockwise until it stops, and then turn it clockwise 2 notches to set it to the N position.
- Remove the control shaft lever.
- Align the groove with the neutral basic line.
- Hold the switch in this position and tighten the bolt.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- Using a screwdriver, bend the tabs of the lock washer.
HINT:
Bend at least 2 washer tabs.
- Install the transmission control shaft lever with the spring washer and nut.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 16 N*m (163 kgf*cm, 12 ft.*lbf)
- Connect the switch connector.
- CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Temporarily connect the shifting rod to the connecting rod swivel with the nut.
HINT:
The nut will be tightened to a torque specification during the shift lever position adjustment procedure.
- Temporarily connect the shifting rod to the connecting rod swivel with the nut.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSTALL COWL TOP VENTILATOR LOUVER (See INSTALLATION )
- ADJUST SHIFT LEVER POSITION
- Adjust the shift lever position (see ADJUSTMENT ).
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Inspect the switch (see ON-VEHICLE INSPECTION ).
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).