LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2007 >> RX 400h AWD >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Hybrid Transaxle >> Shift Lever >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Shift Lever: Installation

  1. INSTALL SHIFT LEVER 
    1. Install the floor shift assembly with the 4 nuts.

      Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf) 

      NOTE: Tighten them in the order, A, B, C and D.
      Fig 1: Locating Floor Shift Assembly
      G05279340Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the pattern select switch connector, the shift lock control computer connector and the indicator light wire connector.
    3. Fig 2: Locating Shift Lock Control Computer Connector And Indicator Light Wire Connector
      G05279314Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY 
    1. Connect the socket of the transmission control cable assembly to the shift lever assembly.
    2. Turn the socket of the transmission control cable assembly clockwise and install the stopper cap.
      NOTE: Make sure that the transmission control cable assembly (socket) is firmly secured to the shift lever assembly.
      Fig 3: Turning Socket Of Transmission Control Cable Assembly Clockwise And Installing Stopper Cap
      G05279342Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Push the stopper cap to the socket as shown in the illustration.
      Fig 4: Pushing Stopper Cap To Socket
      G05279343Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the control cable end to the shift lever assembly.
    NOTE:
    • Install the transmission control cable assembly with the graduated cuts to face upward to prevent torsion of the inner cable.
    • Push the cable end to the bottom of the pin.
    • Confirm that the connection between the socket and the shift lock control unit is fixed.
    Fig 5: Connecting Control Cable End To Shift Lever Assembly
    G05279344Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL FLOOR CARPET COVER CENTER LH  (See INSTALLATION )
  4. INSTALL FLOOR CARPET COVER CENTER RH  (See INSTALLATION )
  5. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY  (See INSTALLATION )
  6. INSTALL INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY NO.2  (See INSTALLATION )
  7. INSTALL INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY LOWER  (See INSTALLATION )
  8. INSTALL COWL SIDE TRIM SUB-ASSEMBLY LH  (See INSTALLATION )
  9. INSTALL COWL SIDE TRIM SUB-ASSEMBLY RH  (See INSTALLATION )
  10. INSTALL FRONT DOOR SCUFF PLATE RH  (See INSTALLATION )
  11. INSTALL FRONT DOOR SCUFF PLATE LH  (See INSTALLATION )
  12. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER  (See INSTALLATION )
  13. INSTALL CONSOLE PANEL UPPER FRONT  (See INSTALLATION )
  14. INSTALL SHIFT LEVER KNOB 
    1. Install the shift lever knob.
    2. Fig 6: Installing Shift Lever Knob
      G05279345Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  15. INSTALL BATTERY NEGATIVE TERMINAL 
  16. INSPECT SHIFT LEVER POSITION (See  ADJUSTMENT  ) 
  17. ADJUST SHIFT LEVER POSITION (See  ADJUSTMENT  ) 
  18. INSPECT SHIFT LEVER OPERATION (See  ADJUSTMENT  ) 
  19. PERFORM INITIALIZATION 

    (See INITIALIZATION )