Integration Relay: Installation
- INSTALL INTEGRATION RELAY
- Connect the 3 connectors.
- Attach the integration relay to the engine room No. 2 relay block.
- Install the engine room No. 1 relay block cover.
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).