Steering Control Ecu: Installation
- INSTALL STEERING CONTROL ECU
- Install the ECU to the junction block with the bolt and nut.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install the ECU to the junction block with the bolt and nut.
- INSTALL STEERING CONTROL ECU WITH JUNCTION BLOCK
- Front side:
- Connect the 5 connectors.
- Rear side:
- Install the ECU with junction block with the bolt and 2 nuts.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Attach the 2 clamps.
- Connect the 7 connectors.
- Install the ECU with junction block with the bolt and 2 nuts.
- Front side:
- INSTALL INSTRUMENT PANEL BOX ASSEMBLY (See INSTALLATION )
- INSTALL DRIVER SIDE KNEE AIRBAG ASSEMBLY (See INSTALLATION )
- INSTALL NO. 1 SWITCH HOLE BASE (See INSTALLATION )
- INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL (See INSTALLATION )
- INSTALL COWL SIDE TRIM BOARD LH (See INSTALLATION )
- INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FRONT DOOR SCUFF PLATE LH (See INSTALLATION )
- INSTALL INSTRUMENT SIDE PANEL LH (See INSTALLATION )
- INSTALL INNER NO. 1 INSTRUMENT PANEL BRACKET COVER LH (See INSTALLATION )
- INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).
- CHECK SRS WARNING LIGHT
- Check the SRS warning light (See DIAGNOSIS SYSTEM ).