DTC B22AE: Open in Alternater Charge Line: Procedure
WARNING: This page is about a different car, the 2010 Lexus LS 460L and 2010 Lexus LS 460. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK GENERATOR ASSEMBLY (TERMINAL B)
- Check the generator's tightening torque value.
Standard torque
Generator Standard torque Terminal 1 (B) 12 N*m (122 kgf*cm, 8.82 ft.*lbf)
NG → TIGHTEN GENERATOR ASSEMBLY (TERMINAL B)
OK: Go to next step
- Check the generator's tightening torque value.
- CHECK GENERATOR ASSEMBLY (IG INPUT VOLTAGE)
- Disconnect the E24 generator connector.
- Measure the resistance according to the value(s) in the table below.
Standard voltage
Tester Connection Switch Condition Specified Condition E24-2 (IG) - Body ground Engine switch on (IG) 11 to 14 V
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK → REPLACE PASSENGER SIDE JUNCTION BLOCK (ELECTRIC POWER CONTROL ECU)