Section 36 (Engine Control System (Service Information)): ECM: Installation: Installation
WARNING: This page is about a different car, the 2010 Lexus GS 450h. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL ECM
- Install the ECM to the ECM lower bracket with the 2 screws.
Torque: 3.0 N*m (30 kgf*cm, 27 in.*lbf)
- Connect the 2 ECM connectors.
- Connect the 2 connectors to the ECM and lower the 2 levers.NOTE:
Make sure that the 2 levers are securely lowered.
- Connect the 2 connectors to the ECM and lower the 2 levers.
- Install the ECM with bracket with the 2 nuts.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
- Install the ECM to the ECM lower bracket with the 2 screws.
- INSTALL HYBRID VEHICLE CONTROL ECU
- Make sure that the lock lever is raised 90° before connecting the connectors. Failure to do this may cause the lock lever and terminals to break.
- Do not twist the wire harness when connecting the connectors.
- Connect the 2 connectors to the hybrid vehicle control ECU and push each lock lever down to lock the connectors.
- Install the ECU with the 2 screws.
Torque: 3.0 N*m (30 kgf*cm, 27 in.*lbf)
- Install the bracket with the 4 screws and nut.
Torque: 3.0 N*m (30 kgf*cm, 27 in.*lbf)
for screw
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
for nut
- Attach the 3 wire harness clamps.
- Attach the side of the wire harness clamp labeled A to the wire harness.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
NOTE:Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- INSTALL RADIATOR RESERVOIR ASSEMBLY
- Install the reservoir with the 2 bolts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Connect the inverter drain hose to the bracket.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- Install the reservoir with the 2 bolts.
- INSTALL ENGINE ROOM NO. 1 RELAY BLOCK COVER
- INSTALL ENGINE ROOM SIDE COVER LH See step 32
- INSTALL COOL AIR INTAKE DUCT SEAL See step 34
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM REGISTRATION . Refer toINSTALLATION - Step 8
- RESET MEMORY . Refer toINSTALLATION - Step 9
- PERFORM INITIALIZATION
- Perform initialization. Refer toINITIALIZATION
.NOTE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization. Refer toINITIALIZATION
.