LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2011 >> IS 250 Base, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 42 (Charging System (Service Information)) >> Generator >> Installation (To 12/2010) >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation (To 12/2010): Installation

WARNING: This page is about a different car, the 2011 Toyota Avalon. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the bracket with the bolt.

      Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

    2. Install the wire harness clamp stay.

      Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf) 

    3. Install the generator assembly with the 2 bolts.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

    4. Install the nut to the cylinder block.

      Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

    5. Connect the generator connector to the generator assembly.
    6. Install the generator wire with the nut.

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

    7. Install the terminal cap.
    8. Connect the wire harness clamp.
  2. INSTALL V-RIBBED BELT  . Refer to INSTALLATION - Step 1
  3. INSTALL V-BANK COVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 14
  4. CONNECT BATTERY NEGATIVE TERMINAL 
  5. PERFORM INITIALIZATION 

    HINT: 

    Refer to INITIALIZATION

    1. Some systems need initialization when disconnecting the battery terminal.