LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2011 >> LS 600hL >> Repair and Diagnosis >> Hybrid/Electric Powertrain >> Battery Management Systems >> Hybrid Battery Control System (Service Specifications) >> Hybrid Battery Control >> Service Data >> Service Data
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Service Data

SMRB (HV battery junction block assembly)
Resistance
g2-1 (CBI) - z30-1 (+) 10 kΩ or higher
(Battery voltage is not applied between terminals z38-3 [SMRB] and z38-2 [GND])
g2-1 (CBI) - z30-1 (+) Below 1Ω
(Battery voltage is applied between terminals z38-3 [SMRB] and z38-2 [GND])
g2-1 (CBI) - z58-1 (CBD) Below 1Ω
(Always)
g2-1 (CBI) - z27-1 (CBPE) Below 1Ω
(Always)
z38-3 (SMRB) - z38-2 (GND) 18.8 to 32.1 Ω at -35 to 80°C (-31 to 176°F)
SMRG (HV battery junction block assembly)
Resistance
g3-1 (CEI) - z34-1 (-) 10 kΩ or higher
(Battery voltage is not applied between terminals z38-1 [SMRG] and z38-2 [GND])
g3-1 (CEI) - z34-1 (-) Below 1Ω
(Battery voltage is applied between terminals z38-1 [SMRG] and z38-2 [GND])
g3-1 (CEI) - z59-1 (CED) Below 1Ω
(Always)
z34-1 (-) - z60-1 (INR) Below 1Ω
(Always)
g3-1 (CEI) - z27-4 (CEPE) Below 1Ω
(Always)
z38-1 (SMRG) - z38-2 (GND) 18.8 to 32.1 Ω at -35 to 80°C (-31 to 176°F)
luggage room junction block (Battery blower relay)
Resistance (BATT FAN1)
LG-1 - LD-3 10 kΩ or higher
(Battery voltage is not applied between terminals LH-1 and LD-14)
LG-1 - LD-3 Below 1Ω
(Battery voltage is applied between terminals LH-1 and LD-14)
luggage room junction block (Battery blower relay)
Resistance (BATT FAN2)
LG-1 - LA-41 10 kΩ or higher
(Battery voltage is not applied between terminals LH-1 and LD-14)
LG-1 - LA-41 Below 1Ω
(Battery voltage is applied between terminals LH-1 and LD-14)