Cold Start Injector Circuit: Procedure
- INSPECT COLD START INJECTOR
- Inspect the cold start injector. Refer to INSPECTION .
NG → See step 4
OK: Go to next step
- INSPECT ECM (STJ1 VOLTAGE)
- Turn the engine switch on (IG).
- Measure the voltage according to the value(s) in the table below.
Standard voltage
Tester Connection Specified condition E3-7 (STJ1) - E4-7 (E1) 11 to 14 V
NG → See step 3
OK → See step 5
- CHECK HARNESS AND CONNECTOR (COLD START INJECTOR - ECM)
- Disconnect the E57 cold start injector connector.
- Disconnect the E3 ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard (Check for open)
Tester Connection Specified condition E57-1 - E3-7 (STJ1) Below 1 Ω Standard (Check for short)
Tester Connection Specified condition E57-1 or E3-7 (STJ1) - Body ground 10 kΩ or higher - Reconnect the ECM connector.
- Reconnect the cold start injector connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK → REPAIR OR REPLACE HARNESS OR CONNECTOR (COLD START INJECTOR - IG2 RELAY)
- REPLACE COLD START INJECTOR. Refer to REMOVAL
- REPLACE ECM. Refer to REMOVAL