LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2012 >> IS 350 Base, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 16 (Engine Control System (Diagnostic Codes (P0190-P062F))) >> SFI System >> DTC P0230: Fuel Pump Primary Circuit >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

DTC P0230: Fuel Pump Primary Circuit: Procedure

WARNING: This page is about a different car, the 2012 Lexus IS 250. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK ECM (FPR VOLTAGE) 
    1. Measure the voltage according to the value(s) in the table below.
      Fig 1: Identifying ECM Connectors E4 And A5
      GTY146350Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard voltage

      Tester Connection Condition Specified Condition
      A5-15 (FPR) - E4-7 (E1) STA signal ON (Cranking) 11 to 14 V
      A5-15 (FPR) - E4-7 (E1) STA signal OFF (Idling with warm engine) 0 to 3 V

    NG → See step   2 

    OK → See step   4 

  2. INSPECT RELAY (F/PMP RELAY) 
    1. Remove the F/PMP relay from the engine room R/B No. 2.
      Fig 2: Inspecting F/PMP Relay
      GTY104187Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance

      Tester Connection Specified Condition
      3 - 4 Below 1 Ω
      3 - 4 10 kΩ or more
      (when battery voltage is applied to terminals 1 and 2)
    3. Reinstall the F/PMP relay.

    NG → REPLACE RELAY (F/PMP RELAY) 

    OK: Go to next step 

  3. CHECK HARNESS AND CONNECTOR (F/PMP RELAY - ECM) 
    1. Remove the F/PMP relay from the engine room R/B No. 2.
    2. Disconnect the A5 ECM connector.
    3. Measure the resistance according to the value(s) in the table below.

      Standard resistance

      Tester Connection Specified Condition
      F/PMP relay terminal 2 - A5-15 (FPR) Below 1 Ω
      F/PMP relay terminal 2 or A5-15 (FPR) - Body Ground 10 kΩ or higher
    4. Reconnect the ECM connector.
    5. Reinstall the F/PMP relay.

    NG → REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK → REPAIR OR REPLACE HARNESS OR CONNECTOR (F/PMP RELAY - C/OPN RELAY) 

  4. REPLACE ECM. Refer to  REMOVAL