Installation [09/2012 - ]
- INSTALL STEERING CONTROL ECU
- Install the ECU with the 3 screws.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
HINT:
- Securely attach the hook (B) of the ECU to the blower.
- Align positioning boss (A) of the blower with the hole of the ECU.
- Connect the 3 ECU connectors.
- Install the ECU with the 3 screws.
- INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY . Refer to INSTALLATION [09/2012 - ] - Step 18
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSTALL COWL TOP VENTILATOR LOUVER RH . Refer to INSTALLATION [09/2012 - ] - Step 15
- CHECK SRS WARNING LIGHT
Refer to DIAGNOSIS SYSTEM [09/2012 - ]
- PERFORM INITIALIZATION NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION [09/2012 - ] .
- PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION
Refer to CALIBRATION [09/2012 - ]