Installation [09/2014 - ]: Procedure
- INSTALL STEERING CONTROL ECU
- Install the steering control ECU with the 2 bolts.
Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf)
- Connect the 4 connectors.
- Install the steering control ECU with the 2 bolts.
- INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
Refer to PROCEDURE - Step 17 [09/2014 - 10/2015] or refer to PROCEDURE - Step 16 [10/2015 - ]
- INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 18 [09/2014 - 10/2015] or refer to PROCEDURE - Step 17 [10/2015 - ]
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 29 [09/2014 - 10/2015] or refer to PROCEDURE - Step 28 [10/2015 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 4
- PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION
(Refer to CALIBRATION [09/2014 - ] )
- PERFORM INITIALIZATION
(Refer to INITIALIZATION [09/2014 - ] )