Installation [09/2014 - ]: Procedure
- INSTALL STEERING CONTROL ECU
- Install the steering control ECU with the 2 bolts.
Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf)
- Connect the 4 connectors.
- Install the steering control ECU with the 2 bolts.
- INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
Refer to PROCEDURE - Step 17 Refer to PROCEDURE - Step 16
- INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 18 Refer to PROCEDURE - Step 17
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 29 Refer to PROCEDURE - Step 28
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See article. Refer to INITIALIZATION [09/2014 - 10/2015] Refer to INITIALIZATION [10/2015 - ] ).
- INSTALL LUGGAGE COMPARTMENT TRIM COVER LH
Refer to PROCEDURE - Step 24
- INSTALL LUGGAGE COMPARTMENT FLOOR MAT
Refer to PROCEDURE - Step 26
- PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION
(See article. Refer to CALIBRATION [09/2014 - ] )
- PERFORM INITIALIZATION
(See article. Refer to INITIALIZATION [09/2014 - ] )