Installation [09/2015 - 12/2017]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Install the wire harness clamp bracket with the bolt.
Torque: 8.4 N.m (86 kgf/cm, 74 in.lbf)
- Type A:
- Install the generator assembly with the 2 bolts.
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- Temporarily install the generator assembly bracket with the 2 bolts.
- Fully tighten the 2 bolts.
Torque: 20 N.m (204 kgf/cm, 15 ft.lbf)
- Install the generator assembly with the 2 bolts.
- Type B:
- Install the generator assembly bracket to the generator assembly with the bolt.
Torque: 20 N.m (204 kgf/cm, 15 ft.lbf)
- Install the generator assembly with the 2 bolts.
Torque: 43 N.m (438 kgf/cm, 32 ft.lbf)
- Install the nut.
Torque: 20 N.m (204 kgf/cm, 15 ft.lbf)
- Install the generator assembly bracket to the generator assembly with the bolt.
- Engage the 2 wire harness clamps.
- Connect the compressor and magnetic clutch connector.
- Connect the generator assembly connector.
- Connect the wire harness to terminal B with the nut.
Torque: 9.8 N.m (100 kgf/cm, 87 in.lbf)
- Close the terminal cap.
- Install the wire harness clamp bracket with the bolt.
- INSTALL V-RIBBED BELT
Refer to INSTALLATION [09/2015 - ]
- INSTALL RADIATOR ASSEMBLY
Refer to INSTALLATION [09/2015 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [09/2015 - 08/2016] , or refer to INITIALIZATION [08/2016 - 12/2017]