LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2019 >> RC 350 Base, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 11 (Engine Control System (2GR-FSE) - Service Information) >> Ignition Coil And Spark Plug >> Installation [09/2014 - 11/2017] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation [09/2014 - 11/2017]: Procedure

WARNING: This page is about a different car, the 2017 Lexus RC 350, 2017 Lexus RC 300, 2016 Lexus RC 350, 2016 Lexus RC 300, and 2015 Lexus RC 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL SPARK PLUG 

    HINT: 

    Perform "Inspection After Repair" after replacing a spark plug.

    Refer to INITIALIZATION [09/2014 - 11/2017]

    1. Install the 6 spark plugs to the cylinder head sub-assembly.

      Torque: 18 N.m (184 kgf/cm, 13 ft.lbf) 

      NOTE:

      If a spark plug has been struck or dropped, replace it.

      HINT: 

      Install the same parts to their original positions.

  2. INSTALL IGNITION COIL ASSEMBLY 

    HINT: 

    Perform "Inspection After Repair" after replacing an ignition coil assembly.

    Refer to INITIALIZATION [09/2014 - 11/2017]

    1. Install the 6 ignition coil assemblies to the cylinder head cover sub-assembly with the 6 bolts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

      NOTE:

      If an ignition coil assembly has been struck or dropped, replace it.

      HINT: 

      Install the same parts to their original positions.

    2. Connect the 6 ignition coil assembly connectors.
  3. INSTALL WIRE HARNESS 
    1. Install the 2 wire harness clamp brackets to the cylinder head cover sub-assembly LH with the 2 bolts.
      GTY457656Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Bolt (A) 

      Torque: 21 N.m (214 kgf/cm, 15 ft.lbf) 

      Bolt (B) 

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

    2. Engage the wire harness clamp to the intake air surge tank assembly.
    3. Install the wire harness to the cylinder head cover sub-assembly with the 2 nuts.

      Torque: 10 N.m (102 kgf/cm, 7 ft.lbf) 

  4. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE 

    See step  3 [09/2014 - 10/2015], or see step  3 [10/2015 - 11/2017]

  5. CONNECT NO. 2 VENTILATION HOSE 

    See step  4 [09/2014 - 10/2015], or see step  4 [10/2015 - 11/2017]

  6. INSTALL ENGINE ROOM SIDE COVER 

    Refer to PROCEDURE - Step 3

  7. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 117 [09/2014 - 10/2015] , or refer to PROCEDURE - Step 118 [10/2015 - 11/2017]

  8. PERFORM INITIALIZATION 
    1. Perform "Inspection After Repair" after replacing an ignition coil assembly and spark plug.

      Refer to INITIALIZATION [09/2014 - 11/2017]