October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Open Circuit
- Neutral switch terminal A (harness-side) and PCM terminal 64 (harness-side)
- Neutral switch terminal B (harness-side) and body GND