October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Main Fan/Additional Fan Motor Operation Inspection: Notes
Connect WDS or equivalent to DLC-2.
Warm-up the engine.
Access ECT PID.
Measure voltage fan control module connector terminal B at 2-pin connector with monitoring ECT PID.