October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Circuit Open/Short Inspection: Notes
- Disconnect the PCM connector. (See
PCM REMOVAL/INSTALLATION
.)
- Connect the SST
(104 Pin Breakout Box) with the PCM disconnected.
- Tighten the connector attaching bolt.
- Tightening torque
- 3.0-5.4 N.m {30-56 kgf°Cm, 27-48 in.lbf}
Courtesy of MAZDA MOTORS CORP.
- Inspect the following wiring harness for open or short circuit (continuity check).
Courtesy of MAZDA MOTORS CORP.