Starting Concerns
PINPOINT TEST 1 DESCRIPTION - STARTING CONCERNS
| PINPOINT TEST 1 | STARTING CONCERNS |
|---|---|
| DESCRIPTION |
|
PINPOINT TEST 1 - STARTING CONCERNS
| PINPOINT TEST 1 | STARTING CONCERNS | ||
|---|---|---|---|
| STEP | INSPECTION | ACTION | |
| 1 | PRELIMINARY CHECKS
|
Yes | Go to next step. |
| No | Repair as necessary. Verify symptom no longer exists. |
||
| 2 | LISTEN FOR STARTER RELAY CLICKING
|
Yes | Go to next step. |
| No | Go to step 5. | ||
| 3 | CHECK STARTING SYSTEM SECONDARY CIRCUITS
|
Yes | Repair as required. |
| No | Go to next step. | ||
| 4 | CHECK BASE ENGINE
|
Yes | Repair as required. |
| No | Verify test results. See SYMPTOM TROUBLESHOOTING CHART - ENGINE DRIVEABILITY to Repair any additional symptoms. |
||
| 5 | CHECK OPERATION OF OTHER ELECTRICAL ACCESSORIES
|
Yes | Go to next step. |
| No | Check the charging system. See SYMPTOM TROUBLESHOOTING CHART - CHARGING SYSTEM . |
||
| 6 | PERFORM PCM KOEO SELF TEST. ALSO RETRIEVE ANY CONTINUOUS MEMORY DTCS.
|
Yes | Check for cause. See DTC INDEX - POWERTRAIN CONTROL MODULE (PCM) . |
| No | Go to next step. | ||
| 7 | CHECK STARTING SYSTEM PRIMARY CIRCUITS
|
Yes | Go to next step. |
| No | Service as required. | ||
| 8 |
|
||