LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2008 >> 5 L4-2.3L >> Repair and Diagnosis >> Transmission and Drivetrain >> Manual Transmission/Transaxle >> Service and Repair >> Overhaul >> Manual Transaxle G35M-R >> Overhaul Procedures G35M-R >> Secondary Shaft Components Inspection >> Synchronizer Ring Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Synchronizer Ring Inspection

Synchronizer Ring Inspection
1. Inspect the synchronizer ring teeth for damage, wear, and cracks.
^ If there is malfunction, replace parts as necessary.
2. Inspect the tapered surface for wear and cracks.
^ If there is malfunction, replace parts as necessary.





3. Measure the clearance between the synchronizer ring and the side of gear circumferentially using a feeler gauge.
^ If the clearance is exceed the minimum, replace the synchronizer ring.

Standard clearance:
1.50 mm (0.059 in)
Minimum:
0.80 mm (0.031 in)