LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2010 >> 6 L4-2.5L >> Repair and Diagnosis >> Transmission and Drivetrain >> Manual Transmission/Transaxle >> Service and Repair >> Overhaul >> Overhaul Procedures G66M-R >> Primary Shaft Components Assembly >> 4TH Synchronizer Ring, 4TH Gear, and Bearing (4TH Gear End) Assembly Note
April 5, 2026: LEMON Manuals is launched! Read the announcement.

4TH Synchronizer Ring, 4TH Gear, and Bearing (4TH Gear End) Assembly Note

4th Synchronizer Ring, 4th Gear, and Bearing (4th Gear End) Assembly Note





1. Install the 4th synchronizer ring, double cone, inner cone, 4th gear, and a new bearing using the SST.





2. Measure the clearance between the 3rd gear and 2nd gear.
^ If it exceeds the maximum specification, reassemble the primary shaft component.

3rd gear thrust clearance
Standard: 0.05 - 0.20 mm (0.002 - 0.007 in)
Maximum: 0.25 mm (0.010 in)





3. Measure the clearance between the 4th gear and bearing.
^ If it exceeds the maximum clearance, reassemble the primary shaft component.

4th gear thrust clearance
Standard: 0.17 - 0.37 mm (0.007 - 0.014 in)
Maximum: 0.42 mm (0.017 in)