LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2012 >> 5 Touring >> Repair and Diagnosis >> Body & Frame >> Exterior/Interior Trim >> Interior Trim System >> Dashboard Removal/Installation >> Bolt H Installation Note
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Bolt H Installation Note

  1. Fit the service hole of dashboard and hinge pillar inner shown in the figure.
    Fig 1: Identifying Service Hole Of Dashboard And Hinge Pillar Inner (Driver And Passenger Side)
    G08153192
  2. Partially tighten the bolts H in the order (1), (2), (3), (4) shown in the figure.
    Fig 2: Identifying Dashboard Bolts H Tightening Sequence (Driver And Passenger Side)
    G08153193
  3. Reconfirms fit the service hole of dashboard and hinge pillar inner, then tighten the upper side bolt H.
    Fig 3: Identifying Service Hole Of Dashboard And Hinge Pillar Inner With Upper Side Bolt H (Driver And Passenger Side)
    G08153194
  4. Adjust the height. (Passenger-side)
  5. Tighten the all of bolts.