September 30: LEMON manuals is back up on a temporary server! Slowness is possible
Main Relay Operation Inspection
- Verify that the main relay clicks when the ignition is switched ON and then off.
- If there is no operation sound, inspect the following:
- Main relay (See RELAY INSPECTION
.)
- Wiring harness and connector between battery and main relay terminal A
- Wiring harness and connector between PCM terminal 2K and main relay terminal E (Without coolant control valve)
- Wiring harness and connector between PCM terminal 2B and main relay terminal E (With coolant control valve)