LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mercury >> 1998 >> Tracer L4-122 2.0L SOHC >> Repair and Diagnosis >> Powertrain Management >> Transmission Control Systems >> Testing and Inspection >> Scan Tool Testing and Procedures >> Installation Procedures
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedures

CAUTION: Do not attempt to pry off connectors with a screwdriver. This will damage the connector and could result in transmission concerns.

Access the Powertrain Control Module (PCM) and connect EEC-V 104-Pin Breakout Box. Connect New Generation Star (NGS) Tester to the Data Link Connector (DLC) and battery power.