LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 1990 >> Montero Base, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 9 (Engine Controls - System/Component Tests) >> Idle Control System >> Idle Speed Control (ISC) Motor Operation Test >> Pickup 2.4L & Ram-50 2.4L
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Pickup 2.4L & Ram-50 2.4L

WARNING: This page is about a different car, the 1991 Mitsubishi Pickup, 1991 Mitsubishi Montero, and 1991 Dodge Ram 50. However, it is still accessible from the selected car via links, so may be relevant.

Connect 6-volt DC source across terminals No. 1 and 2 of ISC motor connector. See Fig 1 . Reverse leads of 6-volt source. If motor does not operate in both directions, replace ISC motor assembly.

Fig 1: ISC Motor Connector Terminal ID (2 Pin)
G91E11837Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.