LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 1999 >> Montero >> Repair and Diagnosis >> Engine Performance >> Engine Controls - On-Vehicle Adjustments >> Ignition Timing >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ignition Timing: Notes

NOTE: Perform all checks with engine at normal operating temperature, cooling fan and accessories off, transmission in Park or Neutral, and front wheels in straight-ahead position. Manufacturer does not provide ignition timing check procedure for Eclipse 2.0L non-turbo.