LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2002 >> Eclipse RS, Standard >> Repair and Diagnosis >> Transmission >> Manual Trans >> Overhaul >> Disassembly And Assembly >> Output Shaft >> Assembly Service Points >> >>G<< 1ST-2ND Speed Synchronizer Hub Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

>>G<< 1ST-2ND Speed Synchronizer Hub Installation

  1. Set the output shaft on the press support stand.
  2. Check that the 1st-2nd speed synchronizer hub is in the correct installation direction, and put it on the output shaft.
    Fig 1: Identifying Installation Direction Of 1st-2nd Speed Synchronizer Hub (F5M42)
    G01107152Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
    Fig 2: Identifying Installation Direction Of 1st-2nd Speed Synchronizer Hub (F5M51)
    G01107153Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  3. Using special tools MD998812, MD998814, MD998825 < F5M42 >, MD998824 < F5M51 > and MD998364 < F5M51 >, press install the 1st-2nd speed synchronizer hub with the press.
    Fig 3: Installing 1st-2nd Speed Synchronizer Hub (F5M42)
    G01107154Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
    Fig 4: Installing 1st-2nd Speed Synchronizer Hub (F5M51)
    G01107155Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  4. Make sure that the outer synchronizer ring on the 1st speed gear side can rotate freely.