Circuit Operation
- A/T control relay (terminal number 1) receives the battery positive voltage from the battery.
- When turning the ignition switch to the "ON" position the PCM receives battery voltage from the ignition switch (terminal 98). Then the PCM (terminal number 50) applies a voltage to the A/T control relay (terminal number 4), and the A/T control relay switch is turned on. When the A/T control relay switch is turned on, the battery applies a power supply voltage to the PCM (terminal numbers 77 and 89).