LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2003 >> Eclipse RS, Standard >> Repair and Diagnosis >> Transmission >> Manual Trans >> Overhaul >> Output Shaft >> Disassembly And Assembly >> Assembly Service Points >> >>G<< 1ST-2ND Speed Synchronizer Hub Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

>>G<< 1ST-2ND Speed Synchronizer Hub Installation

  1. Set the output shaft on the press support stand.
  2. Check that the 1st-2nd speed synchronizer hub is in the correct installation direction, and put it on the output shaft.
  3. Using special tools MD998812, MD998814, MD998825 < F5M42 >, MD998824 < F5M51 > and MD998364 < F5M51 >, press install the 1st-2nd speed synchronizer hub with the press.
  4. Make sure that the outer synchronizer ring on the 1st speed gear side can rotate freely.
    Fig 1: Identifying Installation Direction Of 1St-2Nd Speed Synchronizer Hub F5M42
    G01928600Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
    Fig 2: Identifying Installation Direction Of 1St-2Nd Speed Synchronizer Hub F5M51
    G01928601Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
    Fig 3: Installing 1St-2Nd Speed Synchronizer Hub F5M42
    G01928602Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
    Fig 4: Installing 1St-2Nd Speed Synchronizer Hub F5M51
    G01928603Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.