LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2004 >> Eclipse RS, Standard >> Repair and Diagnosis (Single Page) >> Transmission >> Manual Trans >> Manual Transaxle Overhaul >> Output Shaft >> Disassembly And Assembly >> Assembly Service Points >> >>G<< 1ST-2ND Speed Synchronizer Hub Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

>>G<< 1ST-2ND Speed Synchronizer Hub Installation

  1. Set the output shaft on the press support stand.
  2. Check that the 1st-2nd speed synchronizer hub is in the correct installation direction, and put it on the output shaft.
  3. Using special tools MD998812, MD998814, MD998825 < F5M42>, MD998824 < F5M51> and MD998364 < F5M51>, press install the 1st-2nd speed synchronizer hub with the press.
  4. Make sure that the outer synchronizer ring on the 1st speed gear side can rotate freely.
    Fig 1: Checking 1St-2Nd Speed Synchronizer Hub Installation Direction (F5M42)
    G03305696Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
Fig 2: Checking 1St-2Nd Speed Synchronizer Hub Installation Direction (F5M51)
G03305697Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
Fig 3: Installing 1St-2Nd Speed Synchronizer Hub (F5M42)
G03305698Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
Fig 4: Installing 1St-2Nd Speed Synchronizer Hub (F5M51)
G03305699Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.