LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2005 >> Eclipse L4-2.4L SOHC >> Repair and Diagnosis >> Powertrain Management >> Transmission Control Systems >> Testing and Inspection >> Component Tests and General Diagnostics >> Shift Lock Mechanism Check
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Shift Lock Mechanism Check

SHIFT LOCK MECHANISM CHECK





1. Perform the following inspections.
2. When any of the above shift lock inspection procedures fail, adjust the shift lock cable as follows:
1. Remove the floor console.
2. Shift the selector lever to the "P" position.





3. Loosen the locking nut of the shift lock cable.
4. Adjust the cable so that the end of the shift lock cable is above the red line on the lock cam and tighten the locking nut.
Tightening torque: 12 ± 2 Nm (102 ± 22 inch lbs.)
5. After adjusting, retest the shift lock cable operation. Replace the shift lock cable if it does not operate properly.
6. Install the floor console.