LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2007 >> Eclipse SE, Automatic >> Repair and Diagnosis (Single Page) >> Transmission >> Automatic Trans >> On-Vehicle Service & Diagnosis (A/T) >> Transaxle Assembly >> Removal And Installation >> Installation Service Point >> >> E << Transaxle Control Cable/Adjusting Nut Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

>> E << Transaxle Control Cable/Adjusting Nut Installation

  1. Place the selector lever and manual control lever in the "N" position.
  2. Place the cable stud into the manual control lever slot and install the nut loosely. Gently push the transaxle control cable into the manual control lever slot until the cable is taut. Tighten the nut to the specified torque.

    Tightening torque: 12 +/-2 N.m (107+/-17 in-lb) 

    Fig 1: Placing Cable Stud Into Manual Control Lever Slot
    G04231215Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.


  1. Place the selector lever and manual control lever in the "N" position.
  2. Place the cable stud into the manual control lever slot and install the nut loosely. Gently push the transaxle control cable into the manual control lever slot until the cable is taut. Tighten the nut to the specified torque.

    Tightening torque: 12 +/-2 N.m (107+/-17 in-lb) 

    Fig 1: Placing Selector Lever & Manual Control Lever
    G04231237Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.