Diagnostic Test
- O2 SENSOR HEATER OPERATION
- Turn the ignition off.NOTE: Wait a minimum of 8 minutes to allow the O2 Sensor to cool down before continuing the test. Allow the O2 Sensor voltage to stabilize at 5.0 volts.
- Ignition on, engine not running.
- With a scan tool, actuate the O2 Heater Test.
- With the scan tool, monitor 2/2 O2 Sensor voltage for at least 2 minutes.
Q: Does the O2 Sensor voltage stay above 4.5 volts?
Yes :
- Go To 2
No :
- Refer to the INTERMITTENT CONDITION Diagnostic Procedure .
- Perform the POWERTRAIN VERIFICATION TEST .
- Turn the ignition off.
- O2 HEATER ELEMENT
- Turn the ignition off.NOTE: Allow the O2 Sensor to cool down to room temperature.
- Disconnect the 2/2 O2 Sensor harness connector.
- Measure the resistance across the O2 Sensor Heater element, between the O2 Heater Control terminal and the O2 Heater ground terminal in the component connector.NOTE: O2 Heater Element resistance values should be measured at 70°F (21.1°C). The resistance value will vary with different temperature values.
Q: Is the O2 Sensor Heater Element resistance between 2.0 and 30.0 ohms?
Yes :
- Go To 3
No :
- Replace the O2 Sensor.
- Perform the POWERTRAIN VERIFICATION TEST .
- Turn the ignition off.
- O2 SENSOR
Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
- Ignition on, engine not running.
- With a scan tool, actuate the O2 Heater Test with the O2 Sensor harness connector still disconnected.
- Using a 12-volt test light connected to ground, probe the (K399) O2 2/2 Heater Control circuit in the O2 Sensor harness connector.
Q: Does the test light illuminate brightly and flash on and off during the actuation?
Yes :
- Replace the O2 Sensor.
- Perform the POWERTRAIN VERIFICATION TEST .
No :
- Go To 4
- (K399) O2 2/2 HEATER CONTROL CIRCUIT SHORTED TO GROUND
Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
- Turn the ignition off.
- Disconnect the C3 PCM harness connector.
- Measure the resistance between ground and the (K399) O2 2/2 Heater Control circuit in the O2 Sensor harness connector.
Q: Is the resistance below 5.0 ohms?
Yes :
- Repair the short to ground in the (K399) O2 2/2 Sensor Heater Control circuit.
- Perform the POWERTRAIN VERIFICATION TEST .
No :
- Go To 5
- PCM NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.
- Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.
Q: Were there any problems found?
Yes :
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST .
No :
- Replace and program the Powertrain Control Module per Service Information.
- Perform the POWERTRAIN VERIFICATION TEST .