LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2010 >> Eclipse V6-3.8L (6G75) >> Repair and Diagnosis >> Relays and Modules >> Relays and Modules - Powertrain Management >> Relays and Modules - Computers and Control Systems >> Engine Control Module >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Engine Control Module: Testing and Inspection

CHECK AT THE ENGINE CONTROL MODULE (ECM) [M/T] OR THE POWERTRAIN CONTROL MODULE [PCM) [A/T]

1. Disconnect the ECM [M/T] or the PCM [A/T] connectors B-19, B-20, B-21, B-22 and B-23, and connect check harness special tool MB991923 between the ECM [M/T] connectors or the PCM [A/T] connectors.
2. Measure the voltage between each check harness connector terminal and check harness connector ground terminal (No. 25 or No. 29).

TERMINAL VOLTAGE CHECK CHART

NOTE:
- *1:The average voltage through an analog voltmeter is described in this service manual (because the average voltage is too stable to be shown on a digital voltmeter).
- Vehicles for Canada, the headlight, taillight, etc. remain lit even when the lighting switch is in "OFF" position but is no problem for checks.


Terminal Voltage Check Chart (Part 1):




Terminal Voltage Check Chart (Part 2):




Terminal Voltage Check Chart (Part 3):




Terminal Voltage Check Chart (Part 4):




Terminal Voltage Check Chart (Part 5):




Terminal Voltage Check Chart (Part 6):




Terminal Voltage Check Chart (Part 7):






TERMINAL RESISTANCE AND CONTINUITY CHECK


Terminal Resistance And Continuity Check (Part 1):




Terminal Resistance And Continuity Check (Part 2):




Terminal Resistance And Continuity Check (Part 3):