LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2011 >> Eclipse GS, Automatic >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transaxle System >> Automatic Transaxle Diagnosis >> Symptom Procedures >> INSPECTION PROCEDURE 15: Shift Switch Assembly System >> Circuit Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit Operation

If the select switch of the shift switch assembly is set to the sport mode, battery positive voltage will be applied to the PCM (terminal 39). If the shift switch of the shift switch assembly is set to "UP" or "DOWN" position, battery positive voltage will be applied to the PCM (terminal 32, 36).