LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2011 >> Eclipse GS, Standard >> Repair and Diagnosis (Single Page) >> Transmission >> Transmission Control Systems >> Manual Transaxle Diagnosis & On-Vehicle Service >> Transaxle Control >> Removal And Installation >> Installation Service Points >> >>C<< Shift Cable Connection (Shift Lever Side) Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

>>C<< Shift Cable Connection (Shift Lever Side) Installation

  1. Make sure that there is no excessive play at the shift cable end clip. If there is excessive play or the clip is disengaged from the shift cable end, check the clip opening gap. If the gap is more than 9.5 mm (0.37 inch), squeeze the clip until the gap reaches 5 to 8 mm (0.20 to 0.31 inch).
  2. Fig 1: Checking Clip Opening Gap
    G06684496Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  3. Engage the clip with the shift cable hook securely, and push the clip with your thumbs until it clicks in place.
  4. Install the shift cable to the shift lever.
Fig 2: Installing Clip To Shift Cable
G06684497Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.