LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2013 >> RVR ES >> Repair and Diagnosis >> Electrical >> Charging Systems >> Generator Assembly >> Disassembly And Assembly >> Reassembly Service Points >> >> C << Pulley Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

>> C << Pulley Installation

  1. Clean the inner race of the front bearing and that of the pulley.
    Fig 1: Cleaning Inner Race Of Front Bearing And Pulley
    G07033894Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  2. Screws the inner race of the pulley until it touches the inner race of the front bearing.
    Fig 2: Identifying Pulley
    G05393715Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  3. Set the special tool MB992226 to the pulley.
    Fig 3: Identifying Special Tool
    G05375405Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  4. Set the closed wrench to the hexagonal area of the special tool MB992226.
    Fig 4: Setting Closed Wrench To Hexagonal Area Of Special Tool MB992226
    G05375406Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  5. Insert the hexagonal bit socket having width across flats of 10 mm (0.4 inch) into the hexagonal area of the rotor shaft.
  6. Hold the pulley with the closed wrench.

    Rotate the hexagonal bit socket counterclockwise to tighten it to the specified torque.

    Specified torque: 73 ± 12 N.m (54 ± 8 ft-lb) 

    Fig 5: Rotating Hexagonal Bit Socket Counterclockwise
    G05375417Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.