| Pre-removal operation
|
Post-installation operation
- Fuel Rail and Fuel Injector Assembly Installation
(Refer to
INJECTOR
).
- Throttle Body Installation
(Refer to
THROTTLE BODY
).
- Air Cleaner Assembly Installation (Refer to AIR CLEANER
- Charge air cooler Intake Air Hose A Installation
(Refer to CHARGE AIR COOLER
)
- Engine Cover Installation
(Refer to
ENGINE COVER
).
|