LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2019 >> Eclipse Cross LE >> Repair and Diagnosis (Single Page) >> Engine Performance >> Ignition System >> Engine Overhaul >> Turbocharger Assembly >> Removal And Installation >> Installation Service Points >> >>D<< Oil Pipe Assembly/Gasket/Eye Bolt Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

>>D<< Oil Pipe Assembly/Gasket/Eye Bolt Installation

  1. Temporally tighten the oil pipe assembly mounting eye bolts.
  2. Temporally tighten the clamp mounting bolts.
  3. Tighten the oil pipe assembly mounting eye bolts to the specified torque.

    Tightening torque: 17 ± 2 N.m (13 ± 1 ft-lb) 

  4. Tighten the clamp mounting bolts to the specified torque.

    Tightening torque: 9.5 ± 2.5 N.m (84 ± 22 in-lb)