LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 1976 >> 280Z Automatic Trans >> Repair and Diagnosis >> Engine Performance >> Tune-Up >> Spark Timing Control System >> Testing >> Spark Timing Control System >> 1974 280Z Models
April 5, 2026: LEMON Manuals is launched! Read the announcement.

1974 280Z Models

  1. Inspect cap, rotor, and distributor pick-up coil air gap. Clean adjust, or replace components as necessary. Adjust air gap to 0.008 - 0.016" (0.3 - 0.4 mm).
  2. To check phase difference on dual pick-up distributors, disconnect Green wire from coolant temperature switch and ground wire. Adjust ignition timing to 15 degrees BTDC at 600 RPM.
  3. Install a jumper wire across terminals of coolant temperature switch harness connector. Ignition timing should be 8 degrees BTDC at 600 RPM, which equals a phase difference of 7 degrees. If necessary, turn adjuster plate until correct specifications are obtained. After adjustment, reconnect Red wire to coolant temperature switch.