LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 1978 >> 280Z Automatic Trans >> Repair and Diagnosis >> Engine Performance >> Ignition System >> Transmission Controlled Spark System >> Testing >> 1979 Models >> 210 Auto. Trans. Equipped Models
April 5, 2026: LEMON Manuals is launched! Read the announcement.

210 Auto. Trans. Equipped Models

  1. With engine coolant temperature below 122°F (50°C), start engine and adjust engine speed to approximately 1600 RPM with transmission in "P" Check ignition timing.
  2. From inside vehicle, connect a jumper wire between test connector terminals. See Fig 1. Recheck ignition timing. System is functioning properly if timing does not change with jumper wire installed. If timing changes, check for a defective thermal vacuum switch.
    NOTE: System damage will occur if Jumper wire is connected between any other terminals.
    Fig 1: Connecting Jumper Wire To Test Connector (210 With Auto. Trans.)
    G09313142Courtesy of NISSAN NORTH AMERICA, INC.
  3. Allow engine to reach normal operating temperature, then recheck ignition timing with jumper wire still installed. System is functioning properly if timing has advanced. If timing does not advance, test individual system components to locate cause.
  4. To complete system testing, check top gear detecting switch. With engine idling, disconnect lead wires from vacuum switching valve at connectors. Apply parking and service brakes and block drive wheels.
    NOTE: Vacuum switching valve wires MUST be disconnected during step 5) or damage to ohmmeter will result
  5. Using an ohmmeter, check continuity between test connector terminals with transmission in "R" and then again with transmission in "N". See Fig 1.
  6. Top gear detecting switch is okay if ohmmeter shows continuity with transmission in "R" and no continuity with transmission in "N". If not, replace top gear detecting switch.