LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 1982 >> 280ZX Base, 2.8L Eng VIN C, Automatic Trans >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Electronic Concentrated Engine Control >> Testing >> Component Testing >> Control Unit Ground Circuits
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Control Unit Ground Circuits

Measure resistance between ground and the following control unit connector terminals: 28, 36, 107, 108, 109, 112 and 113. Continuity should be present in all cases. If not, repair harness.