Power Supply And Ground
Power is supplied at all times:
- through 10A fuse [No. 2, located in the fuse block (J/B)]
- to the stop lamp switch terminal +.
When ignition switch is in the ON or START position, power is supplied:
- through 10A fuse [No. 10, located in the fuse block (J/B)]
- to ASCD control unit terminal 5.
- through 10A fuse [No. 20, located in the fuse block (J/B)]
- to park/neutral position relay terminal 1
- through 10A fuse [No. 30, located in the fuse block (J/B)]
- to combination meter terminals 6 and 21.
When park/neutral position switch (A/T) is in the P or N position, ground is supplied:
- to park/neutral position (PNP) relay terminal 2
- through body grounds F33, F35, and F37.
When ASCD CRUISE/ON/OFF switch is depressed (ON), ground is supplied:
- to ASCD control unit terminal 11
- from ASCD steering switch terminal 4
- to ASCD steering switch terminal 1
- from ASCD control unit terminal 24.
Then ASCD control unit illuminates CRUISE indicator.
Ground is supplied:
- to combination meter terminal 22
- from ASCD control unit terminal 15.
Ground is supplied:
- to ASCD control unit terminal 17
- through body grounds M28 and M54.