Full-Latch Switch System Inspection
WARNING: This page is about a different car, the 2005 Nissan Quest. However, it is still accessible from the selected car via links, so may be relevant.
- FULL-LATCH SWITCH SIGNAL INSPECTION
- Turn ignition switch OFF.
- While fully closing and opening the sliding door, check voltage waveform between sliding door latch control unit connector terminal 7 and ground using an oscilloscope.
OK or NG
- OK: Full-latch switch is OK.
- NG: GO TO 2.
- FULL-LATCH SWITCH CIRCUIT INSPECTION
- Disconnect cinch latch switch and sliding door latch control unit.
- Check continuity between cinch latch switch connector terminal 3 and sliding door latch control unit connector terminal 7.Fig 3: Checking Continuity Between Cinch Latch Switch Connector Terminal 3 & Sliding Door Latch Control Unit Connector Terminal 7
Courtesy of NISSAN MOTOR CO., U.S.A.
- 3 (LG) - 7 (LG): Continuity should exist.
OK or NG
- OK: GO TO 3.
- NG: Repair or replace harness.
- FULL-LATCH SWITCH GROUND INSPECTION
- Close the sliding door.
- Check continuity between cinch latch switch connector terminal 1 and ground.
Courtesy of NISSAN MOTOR CO., U.S.A.
- 1 (Y) - Ground: Continuity should exist.
OK or NG
- OK: Replace the cinch latch switch.
- NG: Repair or replace harness.