LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2004 >> Sentra SE-R >> Repair and Diagnosis >> External Pages >> Different car >> Section 1928 (Air Conditioning) >> Heater Control Assembly >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Heater Control Assembly: Installation

WARNING: This page is about a different car, the 2006 Scion tC. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY 
    1. Connect the connector.
    2. Attach the 9 claws to install the instrument cluster finish panel.
  2. INSTALL CONSOLE PANEL UPPER FRONT (See  INSTALLATION  ) 
    Fig 1: Attaching Claws To Installing Instrument Cluster Finish Panel
    G04223651Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle) (See  INSTALLATION  ) 
  4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  5. PERFORM INITIALIZATION 
    1. Perform initialization (see INITIALIZATION ).
      NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.