LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2007 >> Sentra SE-R >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - DTCS P0506 To P2A03 (Qr25DE) >> DTC P0850 PNP Switch >> Overall Function Check >> With GST
April 5, 2026: LEMON Manuals is launched! Read the announcement.

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    TERMINALS VOLTAGE CHART

    Condition (Shift lever) Voltage V (Known-good data)
    P or N position (CVT)
    Neutral position (M/T)
    Approx. 0
    Except above BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) And Ground
    G04900583Courtesy of NISSAN NORTH AMERICA, INC.